B.Tech Chemical Engineering

 

CL 313                           Laboratory 4 – Mass Transfer               0-0-3-3

 

Prerequisite: CL 205 and CL 301

Syllabus: Mass transfer with/without chemical reaction (Solid-Liquid System); Liquid-liquid extraction in a packed bed, Bubble cap distillation column, Absorption with chemical reaction in a packed bed, Humidification and Dehumidification setup, Packed bed distillation column, Experimental water cooling tower, Rotary dryer, Forced draft tray dryer, Batch Crystallizer, Fluidized bed dryer, Vapour in air diffusion.

Texts:

  1. E. Treybal, Mass Transfer Operations, 3rd Edition, McGraw-Hill International Edition, 1981.
  2. K. Dutta, Principles of Mass Transfer and Separation Processes, Prentice Hall of India, 2007.

References:

  1. L. McCabe, J. Smith and P. Harriot, Unit Operations of Chemical Engineering, 6th Edition, McGraw-Hill International Edition, 2001.
  2. C. Wankat, Equilibrium-Staged Separations, Prentice Hall, 1989.
  3. J. Geankoplis, Transport Processes and Unit Operations, 3rd Edition, Prentice Hall, India,1993.
  4. D. Seader, E. J. Henley, D. K. Roper, Separation Process Principles with Applications using Process Simulators, 3rd Edition, John Wiley & Sons, 2011.
  5. Labaratory Manuals