Phone Number
+91-361- 258 2450
Welcome to Department of Civil Engineering
Contact Us | Webmail |
Head of Department & Professor Phd., Civil Engineering (Hydraulics and Water Resources), Indian Institute of Technology Kanpur, India, 2004
0361-258 2401, 0361-258 2428 rkbc[at]iitg.ac.in
Research Area: *Groundwater Management *Flood and Erosion Management *Water Resources Systems Management *Genetic Algorithms *Artificial Neural Networks
PhD: Civil Engineering (Hydraulics and Water Resources), Indian Institute of Technology Kanpur, India, 2004.
Thesis: Management of Saltwater Intrusion in Coastal Aquifers Using ANN-GA Based Simulation Optimization Approach.
Dissertation: Different Numerical Solutions of Steady Gradually Varied Flow in Some Common Open Channels.
BE (Honors): Civil Engineering, Regional Engineering College, Silchar, Assam, India, 1992.
Project: Computer Aided Design of platted beam.
2015 to present: Professor, Department of Civil Engineering, IIT Guwahati, Assam, India.
2011 to 2015: Associate Professor, Department of Civil Engineering, IIT Guwahati, Assam, India.
2008 to 2011: Assistant Professor, Department of Civil Engineering, IIT Guwahati, Assam, India.
2005 to 2008: Assistant Professor, Department of Civil Engineering, NIT Silchar, Assam, India.
2002 to 2005: Lecturer (Sr. Scale), Department of Civil Engineering, NIT Silchar, Assam, India.
1997 to 2002: Lecturer, Department of Civil Engineering, NIT Silchar, Assam, India.
1995 to 1997:Lecturer, Department of Civil Engineering,Jorhat Engineering College, Jorhat, Assam, India.
1. A Real time 2D flood inundation forecasting system for the Brahmaputra River basin using Hydrologic- Hydro dynamic and statistical dynamical approaches
|
2. Mathematical modeling of the river Brahmaputra for the proposed rail bridge at Tezpur
|
3. Study for exploring alternate solution related to the drainage issue of the IGI’s southern outfall
|
4. Conduct of survey of the Satipur drainage system adjacent areas of I6CL, BGR, Dhaligaon
|
5. Mathematical model study of Brahmaputra river from Bahari to Baghbar to evaluate the proposed scheme of WR department
|
6. Sedimentation and morphological study of rivers Dibang and Siang
|
7. Feasibility of the scheme “Construction of embankment on the right bank of river Kopili from Jogimukh to Chapormukh and Padumoni 1 No. Colony to Changchaki on the left bank
|
8. Mathematical modeling of the river Brahmaputra for the proposed rail-cum-road bridge at Saraighat
|
9. Protection of Tinkonia village of Srijangram Revenue Circle and its adjoining areas from erosion, mainly the confluence area of river Beki, Aie-Manas & Brahmaputra up to downstream of Pachosnia and Mohanpur area
|
10. Study of IGI Airport Drainage System for Flood Mitigation near the Southern Outfall
|
11. Technical study and design of drainage system for Kumar Bhaskar Barman township, Kamrup
|
12. Consultancy services for Conducting a technical study to provide an optimal solution for raising & strengthening the existing 4 KM embankment within the available land in Beki
|
13. Drainage issue of the AIIMS campus at Changsari, Guwahati
|
14. Preparation of Feasibility Study Report on Measures for Flood Mitigation and Control of Riverbank Erosion/Shifting of River Course of JiaBharali
|
15. Technical Study to prevent Water Logging in Diphu Medical College and Hospital
|
16. Hydraulic model study along the proposed bridge alignment over the river Brahmaputra at Morigoan
|
17. Hydrologic and Hydrodynamic Study of Kundil River at Dhola Infra Projects Ltd.
|
18. Dam Break Analysis and Disaster Management Plan of Ranganadi Dam
|
19. Mathematical modeling of the river Brahmaputra for the proposed bridge at Jorhar-Majuli section
|
20. Study of Glacial Dynamics and Sustainable Hydrological Resources in Arunachal Himalaya
|
21. Mathematical model study for the proposed bridge over the river Subansiri
|
22. Hydraulic transient analysis of pipeline project of NTPC at Gadarwara
|
23. Impact of Climate Change on the Integrated Flood Vulnerability Index of Hilly terrain
|
24. Dam break analysis and disaster management plan of Kapili HE Plant
|
25. Design of an automatic communication system through cloud computing using sensor-based automated input for the efficient operation of Ranganadi HEP with due emphasis on downstream concerns up to the confluence with Subansiri River
|
26. Archiving, modeling and visualization of the eco-cultural heritage of the Majuli River island of Assam
|
27. Dam Break Analysis of Doyang HE Plant
|
28. Statistical Downscaling for Hydro-Climatic Projections with CMIP5 Simulation to Assess Impact of Climate Change
|
29. Mathematical Model Study of River Brahmaputra with Emphasis on Climate Change
|
30. Morphological Studies of Rivers Brahmaputra, Subansiri and Pagladia using Remote Sensing Technique
|
31. Water Resource and Flood & Erosion Risk Mitigation Planning in Assam
|
32. Numerical modeling based study for assessing the quality of groundwater of the Bharalu River basin of Guwahati city
|
33. Mitigating River Bank Erosion of Kalong River
|
34. Centre of Excellence for Integrated land use planning and water resource management
|
35. Details hydrological study of the Dikrong-Panyor river basin and its impact in the downstream
|
36. Event-based flood forecasting model for flood hazard mitigation
|
No Activity Available!
No Data Available!
Image | Name | Project Title/Area of Research | Duration | ||
1 | Triptimoni Bora, | Development of efficient pollution source identification model using ANN-GMS-GA based simulation-optimization approach | 2011 - | ||
2 | Hriday Moni Kalita | Optimal Protection Measures for Controlling River Bank Erosion | 2009 - | ||
3 | Swapnali Barman | Change in snow cover area and flow scenario of the Brahmaputra and Subansiri basin due to climate change | 00 - |