R&D Projects

Sl No Project Title Agency Duration ( Months ) Amounts in Lakh (.Rs) Role
1Rural Technology Action Group (RuTAG) – IIT GuwahatiPrincipal Scientific Adviser to the Government of IndiaOngoing since 2006327Principal Investigator
2Science & Technology Intervention in North Eastern Region (STINER) - NERAMACNorth Eastern Regional Agricultural Marketing Corporation Ltd. (NERAMAC)6078Principal Investigator
3Science & Technology Intervention in North Eastern Region (STINER) - NEDFiNorth Eastern Development Finance Corporation Ltd. (NEDFi)125.45Principal Investigator
4Science & Technology Intervention in North Eastern Region (STINER) - NEHHDCNorth Eastern Handicrafts & Handlooms Development Corporation Limited (NEHHDC)4845.1Principal Investigator
5Science & Technology Intervention in North Eastern Region (STINER) – DoNER/ NEDFi (Fish cage)North Eastern Development Finance Corporation Ltd. (NEDFi)48137Principal Investigator
6Drudgery Reduction of Tribal Women through S&T Intervention in Betel nut CuttingDepartment of Science & Technology, Government of India2418.8Principal Investigator
7To design, develop and disseminate the modified bicycle as a rural vending cartDepartment of Science & Technology, SEED Division, Government of India1211.14Principal Investigator
8Empowering women through Appropriate technology intervention in weaving sector for Productivity enhancement and drudgery reduction of artisansDepartment of Scientific & Industrial Research (DSIR), Government of India2420.5Principal Investigator
9Development of a training cum production unit of bell metal itemsNorth East Centre for Technology Application & Reach, Government of India (NECTAR)1220.81Principal Investigator
10Solar Powered Pottery Wheel for Drudgery Reduction and Enhancement of ProductivityASTEC123.3Principal Investigator
11Active Vibration Control in Electrical Machines using Built-in ActuatorsDST3635Principal Investigator
12Design and D Development of a Controller for Bridge Configured Winding based Bearing-less motorDIT3690Principal Investigator
13Feasibility Studies of Generating Electric Power using Helical Water TurbinesAssam Power Generation Company Limited2427.2Principal Investigator
14Poverty Alleviation through Mechanization of spawn production of mushroomNorth East Council, Shillong2436.96Principal Investigator
15Design and development of five-speed automated manual transmission for a mid-sized carMHRD187Principal Investigator
16Computer aided analysis and design of high speed ball and roller bearingsARDB367.4Principal Investigator
17Development of an Efficient Power Module for Wheel ChairMinistry of Social Justice & Empowerment185Principal Investigator
18Technical Backup Unit (TBU) at IIT Guwahati for R & D Interface with Khadi and Village Industries SectorKVIC484.2438Principal Investigator
19Computer Aided Analysis of High Speed Rolling Element Bearings Based on Elasto-Hydrodynamic Lubrication TheoryARDB364.5Principal Investigator
20Development of two softwares for design and analysis of (i) Journal Bearing, (ii) Two-Lobe Bearing. (For SRIC, IIT, Kharagpur)SRIC, IIT, Kharagpur62Principal Investigator


Consultancy Project

S.No.Client/Organisation's nameNature of assignmentDuration of assignment
1NEEPCODevelopment of custom made remotely operable shot blasting system with robotic arms for use in steeply inclined long penstocks at NEEPCO Ltd.1 year
2NEEPCOFeasibility study for implementing HTS generator in place of conventional generator in a hydroelectric power plant1 year
3Oil India Ltd.Noise abatement in mechanical drilling rig of Oil India Ltd, Duliajan:18 months
4M/S Hazarika & Company, Golai No.2, P.O.: Digboi, Dist: Tinsukia – 786171Third party inspection of the storage tanks fabricated for IOC (AOD), Digboi2 months
5M/S DU CONS, M.C. Road, GuwahatiThird party inspection of the storage tanks fabricated for IOC (AOD), Digboi:2 months
6SISI, GuwahatiAwareness camp for the Bell Metal artisans from Hajo in Kamrup District1 week
7NERAMACVetting of a Feasibility Report on Setting-up of Cold Storage Chain6 months